Ganga Expressway: Uttar Pradesh’s longest Ganga Expressway will open to the public today. This 594-kilometer-long expressway will not only accelerate development in the state but also create new employment opportunities.
Prime Minister Narendra Modi is expected to inaugurate Uttar Pradesh’s longest Ganga Expressway, which begins at Bijauli in Meerut and ends at Prayagraj, on Wednesday. The inauguration will take place in Hardoi, but a live program will also be held in Meerut on the same day in Bijauli.
A pandal has been erected for this purpose, with seating arrangements for 5,000 people. CCTV cameras and screens are being installed at the venue. The opening of the Ganga Expressway will benefit not only the people of Uttar Pradesh, but also those of Delhi, Uttarakhand, and Haryana. This expressway will directly connect Meerut to Prayagraj. The government has decided to promote the expressway’s features to the public.
The wheels of the country’s development will begin rolling on the 594-kilometer-long Ganga Expressway between Meerut and Prayagraj. This, Uttar Pradesh’s longest greenfield expressway, will connect to Haridwar in Uttarakhand. Currently, this six-lane expressway will be expanded to eight lanes in the future.
Built at a cost of ₹36,230 crore, the Ganga Expressway will pass through 12 districts and 519 villages in Uttar Pradesh, including major cities like Meerut, Bulandshahr, Rae Bareli, Pratapgarh, and Prayagraj. A 3.5-kilometer-long airstrip has also been built on the expressway, allowing Indian Air Force fighter jets to make emergency landings.
ALSO READ | Fighter jets land on expressway in UP: Here’s what IAF’s major drill in Sultanpur means
Complete route
The expressway passes through a 1-kilometer-long bridge over the Ganges at Brajghat in Hapur and a 720-meter-long bridge over the Ramganga River further downstream. Crossing both rivers offers breathtaking views.
This includes:
- 381 underpasses
- 14 major bridges
- 126 minor bridges
- 929 culverts.
- Bijauli (Meerut) to Chandner (Hapur) is 48.9 km
- Chandner (Hapur) to Mirzapur Dungal (Amroha) is 30 km
- Mirzapur Dungal (Amroha) to Nagla Baraha (Badaun) is 50.7 km
- Nagla Baraha (Badaun) to Binawar (Badaun) is 52.1 km
- Binawar (Badaun) to Dari Gulau (Shahjahanpur) is 46.7 km
- and Dari Gulau (Shahjahanpur) to Ubaria Khurd (Hardoi) is 52.9 km.
- From Ubaria Khurd (Hardoi) to Iksai (Hardoi) is 52.4 km
- Iksai (Hardoi) to Raya Mao (Unnao) is 50.2 km
- Raya Mao (Unnao) to Sarson (Unnao) is 53.1 km
- Sarson (Unnao) to Terukha (Raebareli) is 51.8 km
- Terukha (Raebareli) to Naudhiya (Pratapgarh) is 52 km
- Naudhiya (Pratapgarh) to Judhapur Dandu (Prayagraj) is 53 km.
In the future, UPDA will connect the Ganga Expressway to the Noida International Airport in Jewar via the Yamuna Expressway. An 83-kilometer-long link road will connect the Ganga Expressway to the Yamuna Expressway.